US$ 68.00
Electric Start
available in collated StaplePac® and NailPac® or HandDrive cap nails
and ceilings
The unique design keeps the systems horizontal cable in place while still allowing workers enough room to pass the snap hook of their lanyard through the intermediate adapter without ever needing to disconnect from the horizontal lifeline cable system
customers have found them worth the investment because of their superior thermal performance
Railing Base Flange checklist-Estimated Delivery Time 3-5 Working Days Electric StartEasy installation Cast iron or aluminum construction For use with safety yellow, galvanized, or custom color safety rails Meets compliance: OSHA 1926. 502(c); ANSI Z359. 1 07; ANSI A10. 32 12
US$ 68.00
US$ 98.00
US$ 124.00
US$ 14.99
US$ 28.99