Description
Fill the perforated sleeve completely and remove the static mixer completely
Drill hole diameter must be in accordance with anchor size
two-component
Portland Cement Type 10 TDS
The principles for surface preparation for SureBroom are aligned with cement-based overlays placed on concrete and remain constant
Stage 1 Finishing Aid & Evaporation Retarder CaulkingSealantCrackRepair Fill the perforated sleeve completelyHOW IT WORKS Applied during the floating and troweling process, STAGE 1 combines with calcium hydroxide to form calcium silicate hydrate gels that fill surface pores and capillaries to reduce moisture loss, increase concrete fluidity and extend workability giving finishers up to an additional 45 minutes of extra finishing time. APPLICATIONS Use on all concrete flatwork whenever the surface evaporation rate exceeds the concrete bleed rate, such as in
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
























