US$ 45.65
For: Track decoration
Crane Main Structure
E-Revo’s VXL-6s power system now pounds out more tire-scorching motivation than ever before
Backed by unparalleled Traxxas support and parts availability
Unlike old technology that requires an external antenna to achieve adequate reception
Rapido 50628 HO Scale EMD SD9 Diesel Burlington Northern BN 6232 with DCC & Sound Roadname_Winchester Western For: Track decorationRapido 50628 HO Scale EMD SD9 Diesel Burlington Northern BN 6232 with DCC & Sound The SD7 was General Motors Electro Motive Divisions first foray into 6 axle power. The SD stood for Special Duty, while the 7 was carried over for the 4 axle GP7 series. This new series of locomotives provided extra tractive effort spread and weight distribution across the six axle trucks. Production lasted from May of 1951 to November of 1953. A total of 188 units were
US$ 45.65
US$ 105.00
US$ 29.95
US$ 54.95
US$ 28.99
US$ 79.95
US$ 119.95
US$ 139.00
US$ 111.00
US$ 110.00
US$ 83.00
US$ 29.95